Projects Successfully Executed

S.No.

Name of Client

Name of Work

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
National Highway Division.
R&B Division, Sundargarh.
R&B Division No. I, Sambalpur.
Odisha Power Generation Corpoartion Ltd.
Electronics Manufacturing Cluster, Adityapur.
Odisha Coal & Power Ltd, Bhubaneswar.
South East Central Railway, Bilaspur.
R&B Division, Sundargarh.
Odisha Coal and Power Limited, Hemgir.
R&B Division, Jharsuguda.
National Highway Division, Jharsuguda.
South Eastern Railway, Jharsuguda.
Indian Oil Corporation Ltd.
South Eastern Railway, Jharsuguda.
South Eastern Railway, Jharsuguda.
Vedanta Aluminium Limited, Jharsuguda.
RITES Ltd, Raigarh.
Indian Oil Corporation Limited, Jharsuguda
South Eastern Railway, Jharsuguda.
East Coast Railway, Sambalpur.
Mohanadi Coalfields Limited.
The Odisha State Police Housing & Welfare. Corporation Ltd.
South East Central Railway, Bilaspur
National Highway Division, Jharsuguda.
South East Central Railway, Bilaspur
South East Central Railway, Bilaspur
East Coast Railway, Sambalpur.
R&B Division, Sundargarh.
Rehabilitation and Upgrading to 2 lanes/ 2 lane with Paved Shoulders on Bhojpur – Chhatabar Section of NH-200 in the State of Odisha.
Widening of 2 Lane Road to 4 Lane road From Bankibahal to Kanika Railway Siding in the State of Odisha .
Widening to lane of Vijaywada – Ranchi Corridor from (Boudh – Kiakata – Rairakhol road) in Boudh, Sambalpur and Deogarh District.
Construction of Ash Pond at Village Tilia for OPGC II project.
Aditya Electronic Manufacturing cluster Limited building works for Electronic Manufacturing cluster of Adityapur Jamshedpur.
Construction of Resettlement and Rehabilitation (R&R) colony at Sukhabandha under Hemgir Tahasil of Sundargarh Dist, Odisha.
Execution of earth work and Minor bridges in Jamga-Jharsuguda section and 03 Major bridges in connection of construction of 3rd line between Champa-Jharsuguda.
Widening & Strengthening of Karamdihi-Talsara-Lulkidihi road (SH-24) to 2-lane without paved shoulder.
Construction of Resettlement and Rehabilitation (R & R) Colony Phase -II at Hemgir under Hemgir Tahasil of Sundargarh District, Odisha.
Improvement to Laikera – Sahaspur – Bamra road from 0.0 to 26.500 km in the district of Jharsuguda under NABARD Assistance.
Widening  and  strengthening  of  existing single/ Intermediate lane  with   geomatric improvement to two lane carriageway from Km 89/0 to 104/0 km and KM 117/0 to 131/0 of NH -200.
Jharsuguda-Sardega New rail link project-execution between Barpali km 42 to Sardega Km-50 including Sardega Yard for MCL siding.
Construction of Building including internal Electrification, UG Water Tank, RCC Culverts, Roads Drains, tank farm Pitching, Dyke Wall, RCC Driveway at Grass- Root POL Terminal at Jharsuguda, Odisha.”
Jharsuguda MCL siding – Execution of Major Bridges  No-41 (3×18.3  m  plate  girder),  52 (3×30.5 m steel through girder in connection with  construction  of  new  railway  line  from jharsuguda to Sardega for Mahanadi Coal- fields Limited.
Jharsuguda-Sardega Project-Execution of the P.Way linking, Supply of P.Way Fittings, Trans- portation, Supply of track ballast and other allied works for M.C.L
Construction of Buildings, Roads, Bridges, Air Stip,  Drainage works,  Eartworks,  Boundary Wall,  Factory  Shed,  RCC  Slab, Sand  Filling and Repairing, of roads, Drains etc. Including other ancillary works for their Aluminium and power plant.
Construction of shed & Building including Sanitary, water supply, electrical wiring including supply & instalation and other misc. work at Talaipali Mines end of MGR for NTPC / Lara STPP (2 x 880 MW) in Raigarh District, Chhatisgarh state (package-VIA).
Construction of Building including internal Electrification, UG Water Tank, RCC Culverts, Roads Drains, tank farm Pitching, Dyke Wall, RCC Driveway at  proposed  Grass- Root POL Terminal at Jharsuguda, Odisha.”
Jharsuguda- Barpali section execution of minor bridges and other allied misc. work including malidihi yard  in  connection  with construction  at  new railway line for MCL/SBP of CKP division.
Talcher-Sambalpur   doubling   Execution   of Earthwork  in formation,  Minor  bridges  and other misc works in section between Rairakhol-Bamur from Sambalpur end.
Construction of diversion road for Kulda OCP from Bankibahal Chowk to Chattarjhor nallah along Basundhara river over embankment at Basundhara area (Phase-I).
Construction of Annex Building, State Guest House, Pl No. 22, Bhubaneswar
Supplying and stacking of 91,480 cum machine  crushed  stone  ballast  on  cess  in  sec- tion between Jamga-Belpahar in connection with construction of 3rd line between Champa-Jharsuguda.
Widening exesting  single/intermidate  lane stretches to two lane with strengthening on NH-200 for the year 2008-09.
Extension of BOCM-3 & 4 towards mines to create new siding (i.e.BOCM- 6&7) in MCL of IB Velley Area.
Supply,delivery and stacking of 74,500 cum machine  crushed  stone  ballast  on  cess  in section  betweenJsg-belpahar  in  connection with construction of 3rd line between cham- pa-jharsuguda.
Construction of ROB of span (2 x 12m + 2 x22.5 m) RCC T-beam Girder and other allied works  in  connection  with  setting  up Alumina smelter plant at Lapanga station (Deposit work).
Construction of H.L Bridge over river Utiali at 52/900 Km on Karmdihi – Talsara- Lulkidihi road (SH-24) in district of Sundargarh.